Rio Arsil, & Akhirul Desman. (2025). Analysis of the Readiness of Substructure Work Execution Methods (Bore Pile and Pile Cap Foundations) in High-Rise Building Projects. Structures, Infrastructure, Planning, Implementation, and Legislation, 1(1), 1–9. https://doi.org/10.69855/sipil.v1i1.238